by | 22 Jun 2022
Kissing, 22. April 2022 – Greater efficiency and shorter vehicle dwell time in the depot. Pfaff Verkehrstechnik, a member of CMCO Columbus McKinnon Corporation, has been commissioned by Hitachi STS, an Italian general contractor in the railway and local rail transport sector, to supply the plant components for workshop equipment for the new Santa Anita depot of Metro Lima in Peru. The entire equipment, which Pfaff Verkehrstechnik has provided and now installed together with SIM IMPEX, includes an underfloor lifting system as well as bogie lifting stands, axle lifting systems (underfloor), mobile lifting jacks, manual turntables, lifting and turning equipment for bogie frames, auxiliary bogies and transport devices in large quantities. The installation is now complete, and the plant will start operating this year.
Efficiently maintain long trains with high capacity
Metro Lima is the only urban means of transport in Peru that does not contribute to air pollution because it uses electrical energy from hydroelectric power stations. With the opening of the northern section of line 1 in 2014, the metro, which is predominantly an elevated line, reaches a length of 34.6 km with 26 stations. There are plans to expand the rail network to up to five lines, the second line is currently under construction.
Currently, six-carriage MB-300 trains from the Italian rolling stock vehicle manufacturer AnsaldoBreda are in service, as well as several Alstom Metropolis multiple units from the French manufacturer Alstom – a fast metro with high capacity: a train is 107 m long in total, which has to be taken into account in the plant engineering at the new Santa Anita depot.
The new underfloor lifting system from Pfaff Verkehrstechnik is designed for heavy trains of up to 280 tonnes with up to seven carriages and a total length of 120 m. The synchronisation of the wheel lifting platforms is controlled by the PLC control within a narrow tolerance range of +/- 5 mm, i.e. over the entire length of 120 m, the maximum height deviation of the lifting platforms is only 10 mm. Their cantilever design ensures that the removed bogies can be pushed underneath the lifted train for separate maintenance.
Separating the bogies from the carriage body
12 auxiliary bogies with a load capacity of 20 tonnes ensure that the underfloor lifting system is not blocked for long by a lifted vehicle. After the bogies of the carriages have been dismantled, the carriage bodies are placed on the auxiliary bogies and pushed with them into a separate storage area. This means that the lifting stand is immediately ready for another vehicle. Mobile lifting jacks from Pfaff-Verkehrstechnik, each with a load capacity of 15 tonnes, are used at the Santa Anita depot to lift individual uncoupled carriages for their maintenance.
Several manual turntables with a diameter of 3200 mm have also been installed in the depot to move bogies weighing up to 8 tonnes between the hall areas. Maintenance and repair work on the bogies is carried out with underfloor bogie lifting stands from Pfaff Verkehrstechnik, which bring the bogies into the best ergonomic position up to a maximum lifting height of 1600 mm.
A lifting and turning system consisting of two lifting jacks with a crossbeam can turn the bogies, which are fixed by means of a clamping system, and rotate them to any desired position at the desired lifting height so that inspection work on the bogie frame can be carried out in an ergonomic position. In the service area, two underfloor axle racks (hydraulic lifting tables for loads up to 2 tonnes) raise individual axles to the desired working height.
Remote commissioning
The Berlin-based company SIM IMPEX – a Pfaff Verkehrstechnik sales partner that promotes sustainable mobility with innovative transport systems, especially in Latin American cities – was responsible for installing the systems. In the local markets, teams of specialised professionals ensure technical support and customer assistance during the installation of the components.
The installation and commissioning, which had to be carried out remotely due to the prevailing Covid-19 regulations, presented a major challenge for SIM IMPEX and Pfaff Verkehrstechnik as the main supplier of the state-of-the-art facility, which now ensures more efficient maintenance and repair of entire metro trains, individual carriages, the bogies, axles, windows and doors.
For more information on Pfaff Verkehrstechnik and their products, see: https://www.columbusmckinnon.com/en-de/our-brands/pfaff-silberblau/
Images and captions
Image 1. Pfaff Verkehrstechnik has successfully completed a major contract for the new Metro Lima depot in Peru, which includes mobile lifting jacks for lifting individual uncoupled carriages
Image 2. Underfloor lifting system for heavy trains with up to seven carriages and a length of 120 m
Image 3. Maintenance and repair work on the bogies is carried out with underfloor bogie lifting stands
Image 4. Manual turntables are used to move the bogies between the different areas of the hall
Image 5. In the service area, hydraulic lifting tables lift loads of up to 2 tonnes (underfloor axle racks)
Company contact:
COLUMBUS McKINNON
Engineered Products GmbH
Press: Petra Lugner
E-Mail: presse.kissing@cmco.eu
Internet: www.pfaff-silberblau.com
For 150 years we have been a technological leader in motion and lifting technology.
Whether turnkey lifting systems for trains and buses, spindle lifting elements, electromechanical components of linear drive technology or hoists
for steel and heavy industry, logistics, stage technology, offshore installations and ATEX areas.
Customers worldwide benefit from our products, services and complete solutions from project planning to maintenance.
Pfaff Verkehrstechnik is expanding its product portfolio to include solutions for servicing and maintenance work on the roofs of a wide variety of buses, primarily on electrically and gas-powered vehicles. The new roof working platforms with an adjustable height of 1.5 m to 4.5 m can be flexibly adapted to the respective bus fleet due to different segment lengths of 3 m to 9 m according to the modular principle, regardless of whether it is simple buses with 12 m, double-decker buses with 14 m or articulated buses with 18 m length.
BLS, a railway operating company in Switzerland, has equipped the modernised plant in Spiez with lifting jacks from Pfaff Verkehrstechnik for the maintenance of the latest generation of multiple units. Thanks to the wireless control of the entire lifting jack system via a WLAN infrastructure, flexibility during maintenance work is increased and there are no longer any troublesome control cables on the ground.
The 16 Pfaff-silberblau lifting jacks each have a load capacity of 25 tonnes and can lift and lower entire multiple units with a total weight of up to 400 tonnes and a total length of up to 105 metres for maintenance purposes, for example the well-known 4-carriage multiple-unit train “Mutz” with a total weight of 217 tonnes. Thanks to the new system, which can be extended to include further lifting jacks, the modernised workshops in Spiez will also be able to service 6-carriage multiple units in future.
Columbus McKinnon's website and/or mobile terms, privacy and security policies don't apply to the site or app you're about to visit. Please review its terms, privacy and security policies to see how they apply to you.